Frequently Asked Questions

Who can design and build RBW(Restricted Building Work)?

Structural, weather-tightness, and fire-safety work must be designed and carried out by Licensed BuildingPractitioners (LBPs). You’ll need Records of Work from designers/builders and ProducerStatements from engineers for council sign-off.

Do I need a building consent ora resource consent?

Most structural work e.g. plumbing/drainage changes where there is no existing fixtures, decks over 1.5m, new windows/doors in bracing walls, etc. need a building consent. In certain minor cases an exemption from consent can be applied for. You’ll need a resource consent if your design breaches the Christchurch District Plan (e.g., setbacks, height in relation to boundary, site coverage) or is in a Character/Heritage area or Flood Management Area (FMA) or digging more than 20m3 outside of the building envelope.

What if there are easements or Council/private drains on my site?

They can restrict building locations and require specific clearances or approvals. Verify easements on the title and locate services before design.

What can be done without consent?

Many small jobs are exempt. Common examples: decks up to 1.5 m high, same-size window/door replacements that don’t affect bracing, non-structural internal linings, and like-for-like bathrooms/kitchens (no new plumbing points). Exempt does not mean DIY - Restricted Building Work still needs LBPs, and council may ask for evidence of compliance later.

What due-diligence reports should I get up front?

At minimum: LIM, topographical site survey, geotechnical assessment (if TC2/TC3 or uncertain), and an asbestos survey for pre-2000 homes.

How do I know if asbestos is present?

You can’t confirm asbestos by sight. If your home or outbuildings were built or renovated before 2000, assume risk in materials like textured ceilings, fibre-cement cladding/soffits and “Super Six” roofing, vinyl floor tiles/black adhesive, pipe lagging, backing boards, and some gaskets. Pre demolition surveys by a licensed assessor can help in ascertaining if asbestos is present and help with planning.

How long do consents take—and how do I avoid delays?

Statutorily 20 working days for building consent once accepted, but Requests for Information (RFIs) pause the clock. Your designer will submit complete drawings/specs, geotech and engineering and ideally respond to RFIs quickly to keep things moving. An allowance of 6 weeks in reasonable.

What insurance do I need during the build?

For new builds your building contractor should cover the Contract Works insurance which covers the works onsite and Public Liability insurance. In a renovation it is common for the homeowner to organise the contract works insurance as there will already be an interested party insuring the property. You should notify your house insurer before work starts for any works.

What’s the difference between Practical Completion and the Code Compliance Certificate (CCC)?

Practical Completion = you can use the space (subject to contract terms) and move into the defects period.
CCC = council’s formal sign-off after final inspections, producer statements, as-built, and documentation. Aim to compile paperwork as you go to avoid CCC delays.